2014 12 07 – Clear brash and to inspect the state of the Briggate Lock area
-
2014 11 23 – Mow the south side of Honing Staithe Cut and to continue clearing brash
-
2014 11 09 – Clear brash especially from the top of the Briggate pill-box area
-
2014 10 26 – Cut heavy growth of brash from the south side of Briggate Lock and roadside wall
-
2014 10 12 – Clear brash and trees from the Swafield Lock walls
-
2014 09 28 – Clear small trees and brash within Swafield Lock No. 6. Investigate the position of the cill
-
2014 08 10 – Clear and tidy Ebridge mill-pond area and to clear Bacton Wood Lock No. 4 of small saplings
-
2014 07 27 – Mow the reeds and clear brash approaching Pigney’s Wood at Royston Bridge area
-
2014 07 13 – Complete installation of the 2′ timber walkway near the quay head at Royston Bridge
-
2014 06 29 – Continue to install new quay heading beside the old Wherry PH
-
2014 06 02 – Tidy grassed areas on the Ebridge lock island and to remove floating weed
-
2014 04 27 – Cut back willows and brash at Ebridge Lock
-
2014 04 06 – Cut back willows and brash north of Ebridge Lock No. 3
-
2014 03 23 – To clear small trees and brash near to Pigneys Wood
-
2014 03 09 – Clear but not burn brash (for visiting wildlife) on the North bank near to Pigneys Wood
-
2014 02 23 – Clear Ebridge spillway of brash, weeds and soil
-
2014 02 09 – Clear brash and cut back willows on the east bank at Briggate
-
2014 01 26 – To clear reeds and brash in the bed of the Briggate Mill pond
-
2014 01 12 – To review canal for obstructions and to clear brash at Honing Staithe