2015 12 20 – Clear bamboo from the south west bank below Swafield Bridge
2015 11 22 – Conintue to clear brash at Pigney’s Wood canal area
2015 11 08 – Continue to clear brash at Pigney’s Wood area
2015 10 25 – Clear brash and old stumps near to Pigney’s Wood canal area
2015 10 11 – Clear brash and old stumps in the Pigney’s Wood canal area
2015 09 27 – Clear brash and small trees Pigney’s Wood
2015 08 30 – Remove footbridge to allow machinery access to the canal at Pigney’s Wood and much more
2015 08 16 – Clear brash and small trees in the Ebridge Mill pond area
2015 08 02 – Cut weed at entrance of Bacton Wood Lock and clear large tree roots
2015 07 19 – Continue mowing work and clear small trees Bacton Wood Lock
2015 07 05 – Mow surround area and remove small trees in mouth of Bacton Wood Lock
2015 06 21 – Remove brash and small trees from Bacton Wood Lock. Continue work to pontoon
2015 05 24 – Remove trees from below Bacton Wood Lock and to continue restoration work to pontoon
2015 05 10 – Clear brash at Swafield
2015 04 26 – Remove trees from below the Bacton Wood Lock and to continue work on pontoon
2015 04 12 – Restoration work on donated pontoon near to the Bacton Wood Lock area
2015 03 29 – To clear brash at Swafield
2015 03 01 – To clear brash and small trees Briggate as agreed with NWCC Ltd.
2015 02 15 – Clear the heaps of canadian pond-weed and remove to Ebridge dry dock area
2015 02 01 – Conintue to clear brash in the North East side of the canal at Swafield